ZIMSEC A Level · Accounting · Form 6
Budgets
Financial plans for a future period: sales, production, purchases, labour, cash and master budgets.
- Benefits: planning, coordination, control, motivation and performance measurement.
- Limitations: time-consuming, can be inflexible, may cause budgetary slack or demotivation if imposed.
- Flexible budgets adjust for actual activity so that comparisons are fair.
Cash budgets
Show expected receipts and payments each month, including credit timings, and highlight shortages early.
Standard costing and variances
A standard cost is the expected cost per unit. Variances compare actual with standard (F = favourable, A = adverse).
- Material price variance = (standard price − actual price) × actual quantity.
- Material usage variance = (standard quantity for actual output − actual quantity) × standard price.
- Labour rate variance = (standard rate − actual rate) × actual hours.
- Labour efficiency variance = (standard hours for actual output − actual hours) × standard rate.
Worked example: Standard: 4 kg at US$3/kg per unit. Actual output 500 units used 2 100 kg costing US$5 880. Find the price and usage variances.
Actual price = 5 880 ÷ 2 100 = US$2.80/kg
Price variance = (3.00 − 2.80) × 2 100 = US$420 F
Usage variance = (2 000 − 2 100) × 3.00 = US$300 A
Causes
Cheaper materials (favourable price) may be poorer quality, causing more waste (adverse usage) – variances are often linked.
Check yourself
- Give two benefits of budgeting.
- Standard labour rate US$5; actual rate US$5.50 for 1 000 hours. Find the rate variance.
- Why use a flexible budget?
Show answers
- Any two: planning, coordination, control, motivation, performance measurement.
- (5.00 − 5.50) × 1 000 = US$500 A
- To compare actual results with a budget adjusted to the actual level of activity.
Questions about this topic (0)
No questions about this topic yet.
Sign in or create a free account to join in.